Manufacturing company data and the export rules check

EAR and ITAR text quoted from the eCFR.

A manufacturer can license redacted maintenance tickets, quality records and supplier emails, and keep ownership of every original.

Maintenance tickets and quality records build up every shift.

You keep ownership. A buyer only sees a copy you approve.

No files or passwords to apply · You approve every buyer · Terms in writing first

Drawings and process specs need an export check first.1 Under the EAR, releasing technology or source code to a foreign person inside the United States counts as an export, and defense parts carry ITAR technical data rules.1, 2

Job shop or multi plant group, you can apply without sending a drawing.

Why would a deemed export matter for a data license?

Because a buyer's team may include foreign persons.1 The EAR defines export to include "Releasing or otherwise transferring 'technology' or source code (but not object code) to a foreign person in the United States (a 'deemed export')."1 It adds that such a release "is a deemed export to the foreign person's most recent country of citizenship or permanent residency."1

What ITAR calls technical data

ITAR covers information "required for the design, development, production, manufacture, assembly, operation, repair, testing, maintenance, or modification of defense articles," including "blueprints, drawings, photographs, plans, instructions, or documentation."2 It excludes "basic marketing information on function or purpose or general system descriptions of defense articles."2 If you build anything on the Munitions List, those files stay out.2

Plant systems that hold the history

  • An ERP such as Epicor, SAP or Plex: work orders, routings, purchase orders.
  • MES and machine data with downtime codes.
  • A CMMS like Fiix or UpKeep: maintenance requests, fixes and parts used.
  • Quality records: nonconformance reports, CAPA files and audit findings.
  • PLM and CAD vaults with drawings and revisions.
  • Email and Teams threads with suppliers about late or bad parts.

A next step

Root cause notes are what buyers rarely see.

Start with questions. No drawing leaves your plant to start.

You keep ownership. A buyer only sees a copy you approve.

Alarm, root cause, back online

A spindle alarm trips on second shift. The operator logs it, maintenance swaps a sensor, the alarm returns, and an engineer traces it to a worn bearing. A CAPA records the root cause and the fix, and the line runs clean the next month. That chain of context, action and outcome is rare in public data and central to industrial AI agents.3

Plant datasets that can find different buyers

Each record type you're willing to license is placed with buyers who want that type, so maintenance history and quality files can go separate ways.

Dataset System Likely interest Checked or removed first
Maintenance tickets and fixes CMMS Industrial maintenance AI Technician names
Nonconformance and CAPA files Quality system Quality and inspection tools Customer part numbers if confidential
Work instructions and SOPs Shared drive, MES Robotics and operations agents Export classification first
Supplier threads Email, Teams Procurement agents Supplier pricing and names
Drawings and process specs PLM, CAD Few, given the export load EAR and ITAR review before anything

Interest is our read of where buyers ask, not a commitment.

Eight years of maintenance on three shifts (example only)

Arithmetic, not a value. Three shifts logging 15 maintenance tickets each a day, 300 days a year for eight years, is about 108,000 tickets. Your CMMS work order report holds the real count.

Several buyers at once, and you decide on exclusivity

We show a prepared plant file to more than one buyer at the same time. You don't sign exclusively with us. A buyer that wants exclusivity on maintenance data, for example, asks in its own deal, and the decision stays with you. Only a small cleared sample moves before an NDA and written terms.

Plant managers and owners ask

Our customers own the part designs. Can we license our maintenance logs?

Often yes, if the logs don't carry customer drawings or confidential part data. Check customer terms. Read trade secrets.

We write our own machine code. Does that change things?

Source code falls under the deemed export text too.1 See software company data.

Do drawings ever go in?

Rarely, and only after an export review by your own counsel.

Export rules and pages cited, read 25 November 2026

  • 15 CFR 734.13, export, EAR.1
  • 22 CFR 120.33, technical data, ITAR.2
  • OpenAI Data Partnerships page.3

Sources

  1. 15 CFR 734.13, Export, Export Administration Regulations (eCFR). Accessed 25 Nov 2026.
  2. 22 CFR 120.33, Technical data, ITAR (eCFR). Accessed 25 Nov 2026.
  3. OpenAI, OpenAI Data Partnerships, dated 9 November 2023, including the editor's note that submissions are not being accepted. Accessed 24 Nov 2026.

Start selling your plant records

Start selling. Use the estimate sheet if you want a public range, not an offer.

You keep ownership. A buyer only sees a copy you approve.